You can install new O-rings, install the A/C lines, the TXV, the TXV line bracket, the TXV to evaporator bolts, the HVAC line clamp, the HVAC line clamp screw, the insulation, the instrument panel (I/P) carrier, evacuate the A/C system and leak test the fittings of the component.
By BobGM Specialist
28/10/2022