The procedure is to install the generator to the engine, install the generator upper bolt, raise and support the vehicle, install the generator lower bolts, install the battery positive lead and the generator BAT terminal nut to the generator, install the BAT terminal boot, connect the electrical connector to the generator, install the drive belt to the generator, and connect the battery negative cable.
By BobGM Specialist
28/10/2022