First, clean the area where the molding will be installed and dry the area thoroughly. Heat the mounting surface to 80-105°F and place the body side molding to the location marks. Apply equal pressure along the body side molding and remove the protective tape from the mounting surface.
By BobGM Specialist
28/10/2022