You should use the J 26549-E to install the orifice tube into the evaporator tube, coat the new O-ring seal with 525 viscosity refrigeration oil, install the new O-ring seal, connect the evaporator tube connection, charge the system and inspect the system for leaks.
By BobGM Specialist
28/10/2022