The procedure is to cut through the swage ring, remove the large boot retaining clamp, dispose of the large boot retaining clamp, separate the inboard boot from the trilobal tripot bushing, remove the housing, remove the trilobal tripot bushing, spread the spacer rings, remove the spacer ring, the spider assembly, the second spacer ring, and the inboard boot, clean the half shaft bar, inspect the needle roller, the needle bearings and the trunnion on the spider assembly, check the tripot housing and replace any damaged parts.
By BobGM Specialist
01/11/2022